Baker Motor Parking Lot

SILD Field Notes

SILD was a subcontractor on this project, hired to construct a parking lot for an automotive dealer. An underground retention system was installed in the parking lot, receiving the drainage from the new storm drain system. Associated work consisted of installing curb inlets, catch basins, and reinforced concrete pipe. After underground construction was complete, curb and gutter, and asphalt paving were constructed.

Site Photos

Recent Projects

Dorchester District Two Middle School Site

SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction.  The 135,000 square feet building pad required chemical stabilization for on time delivery.  Utility construction included 2,000 linear feet...

Carnes K8 Campus

The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District.  Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities.  Over 6 acres of...

Carnes Davis Apartments

The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community.  Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...