Concrete Work

ROAD READY

 

Asphalt paving, concrete paving, and curb and gutter are a crucial task on every project. This is typically the last items installed on a project before landscaping. It is crucial that these items are installed correctly the first time, SILD has the staff and equipment to ensure this happens. Working with geotechnical engineers to guarantee these items are installed per specification.

Carnes K8 Campus

The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District.  Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities.  Over 6 acres of...

Carnes Davis Apartments

The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community.  Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...

Crescent Cove Villas

SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.

Grand Bees Amenity Center

The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.

Beech Hill Middle School

SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction.

Crescent Cove

This project is a turn key site development located in Summerville, SC. Scope consists of clearing, grading, building pads, roadways, and utilities. 

Caliber Collision Carolina Park

Site package for an automotive faciltiy located in Mt. Pleasant, SC. Scope included erosion control, clearing, underground retention system, storm drainage, asphalt paving, and site concrete.

Renau Boulevard Culvert

New box culvert construction in Summerville, SC. Work consisted of bypassing freshwater stream, removing existing roadway, pre cast structures, cast in place wing walls, and road construction.

West Ashley Center for Advanced Studies

Site package for a new education facility located in West Ashley, SC. Work consists of mass grading, parking lot construction, building pad, storm drainage, utilities, and site concrete.

Ladson Elementary Fire Lane

Site improvements project on the campus of Ladson Elementary School. Consisting of demolition, additional sidewalks, storm drainage, and fire access road.

Waterford Townhomes Phase 2B

SILD was the selected site contractor on this residential development. Worked consisted of clearing, preparing multiple home sites, water services, sewer services, storm drain, asphalt paving, and curb.

West Ashley Library

The site package consists of clearing and grubbing an existing tract. Removing several thousand cubic yards of unsuitable soils, and replacing these soils with structurally sound fill.

Moultrie Middle School Addition

This is a construction addition of an existing middle school in Mt. Pleasant, South Carolina. The earthwork consisted of prepping building pads for several additions around the campus.

Recent Projects

Dorchester District Two Middle School Site

SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction.  The 135,000 square feet building pad required chemical stabilization for on time delivery.  Utility construction included 2,000 linear feet...

Carnes K8 Campus

The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District.  Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities.  Over 6 acres of...

Carnes Davis Apartments

The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community.  Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...