SILD - Sea Island Land Development

Home

Services

Projects

Giving Back

Careers

Contact

Excavating

MOVING THE EARTH

 

SILD has a large range of excavation capabilities. Excavating retention ponds for storm water management. Removing excess or unsuitable soils to provide a structural working platform. With a fully integrated GPS control system, SILD ensures accurate and timely excavations.

Carnes K8 Campus

The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District.  Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities.  Over 6 acres of...

Carnes Davis Apartments

The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community.  Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...

Central Ave Townhomes

The Lennar Corporation selected SILD to perform the site work package for the 60 unit townhome development in Summerville. Several existing structures had to be demolished before excavation and grading work could begin. Due to site topography, 25,000 cubic yards of...

Founders Yard

The Founders Yard project is a 340+ unit multifamily complex on a 14 acre site located in West Ashley. CF Evans selected SILD as the site work subcontractor for the project. Major project accomplishments included the install of a Cultec underground stormwater...

CSU Science Building

SILD was selected as the site contractor for CSU’s new Science & Engineering Building by Trident Construction.

Crescent Cove Villas

SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.

Grand Bees Amenity Center

The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.

Jacksonboro Sand Mine

Approximately, 30,000 cubic yards of dirt was excavated within the first three months of operation.

Beech Hill Middle School

SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction.

Crescent Cove

This project is a turn key site development located in Summerville, SC. Scope consists of clearing, grading, building pads, roadways, and utilities. 

Benton House Addition

Site package for an addition to an existing elderly care facility located in West Ashley, SC. Scope included erosion control, demolition, removing topsoil, and building pad preparation.

Caliber Collision Carolina Park

Site package for an automotive faciltiy located in Mt. Pleasant, SC. Scope included erosion control, clearing, underground retention system, storm drainage, asphalt paving, and site concrete.

Renau Boulevard Culvert

New box culvert construction in Summerville, SC. Work consisted of bypassing freshwater stream, removing existing roadway, pre cast structures, cast in place wing walls, and road construction.

Recent Projects

Dorchester District Two Middle School Site

SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction.  The 135,000 square feet building pad required chemical stabilization for on time delivery.  Utility construction included 2,000 linear feet...

Carnes K8 Campus

The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District.  Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities.  Over 6 acres of...

Carnes Davis Apartments

The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community.  Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...