Land Clearing

READY FOR DEVELOPMENT

 

Most projects start with clearing a site of existing trees and vegetation, but in the Lowcountry of South Carolina, trees are only removed when absolutely necessary. Every clearing operation starts with a land surveyor identifying clearing limits and marking trees that are to remain, and all trees that are to stay onsite are protected by tree barricades. On larger sites, tracked cutters and skitters are used to log the site.
Crescent Cove Villas

Crescent Cove Villas

SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.

Grand Bees Amenity Center

Grand Bees Amenity Center

The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.

Beech Hill Middle School

Beech Hill Middle School

SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction.

Crescent Cove

Crescent Cove

This project is a turn key site development located in Summerville, SC. Scope consists of clearing, grading, building pads, roadways, and utilities. 

Benton House Addition

Benton House Addition

Site package for an addition to an existing elderly care facility located in West Ashley, SC. Scope included erosion control, demolition, removing topsoil, and building pad preparation.

Caliber Collision Carolina Park

Caliber Collision Carolina Park

Site package for an automotive faciltiy located in Mt. Pleasant, SC. Scope included erosion control, clearing, underground retention system, storm drainage, asphalt paving, and site concrete.

Renau Boulevard Culvert

Renau Boulevard Culvert

New box culvert construction in Summerville, SC. Work consisted of bypassing freshwater stream, removing existing roadway, pre cast structures, cast in place wing walls, and road construction.

West Ashley Center for Advanced Studies

West Ashley Center for Advanced Studies

Site package for a new education facility located in West Ashley, SC. Work consists of mass grading, parking lot construction, building pad, storm drainage, utilities, and site concrete.

Ladson Elementary Fire Lane

Ladson Elementary Fire Lane

Site improvements project on the campus of Ladson Elementary School. Consisting of demolition, additional sidewalks, storm drainage, and fire access road.

Waterford Townhomes Phase 2B

Waterford Townhomes Phase 2B

SILD was the selected site contractor on this residential development. Worked consisted of clearing, preparing multiple home sites, water services, sewer services, storm drain, asphalt paving, and curb.

West Ashley Library

West Ashley Library

The site package consists of clearing and grubbing an existing tract. Removing several thousand cubic yards of unsuitable soils, and replacing these soils with structurally sound fill.

St. Andrews Church Expansion

St. Andrews Church Expansion

This project is an expansion of an existing church in Mt. Pleasant, South Carolina. Work consists of removing existing trees, utilizing arborists and large excavators, to safely remove the trees without damaging the surrounding buildings and houses.

Brighton Park Commercial Ponds

Brighton Park Commercial Ponds

SILD was the selected general contractor for this project, located in Nexton, South Carolina. This project was an early site package for a commercial property, where the objective was to provide additional drainage and earthwork for a 9 acre site.

Recent Projects

CSU Science Building

SILD was selected as the site contractor for CSU’s new Science & Engineering Building by Trident Construction.

Crescent Cove Villas

SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.