Public Utilities

GO WITH THE FLOW

 

SILD is a licensed water and sewer main contractor in South Carolina, with our own utility staff that complete all public utility projects in house, without outsourcing to subcontractors. Projects range from installing new water and sewer mains for a subdivision to installing individual services. SILD utilizes state of the art lasers and levels to ensure utilities are installed at the exact depth and slope.
Crescent Cove Villas

Crescent Cove Villas

SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.

Grand Bees Amenity Center

Grand Bees Amenity Center

The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.

Beech Hill Middle School

Beech Hill Middle School

SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction.

Crescent Cove

Crescent Cove

This project is a turn key site development located in Summerville, SC. Scope consists of clearing, grading, building pads, roadways, and utilities. 

Caliber Collision Carolina Park

Caliber Collision Carolina Park

Site package for an automotive faciltiy located in Mt. Pleasant, SC. Scope included erosion control, clearing, underground retention system, storm drainage, asphalt paving, and site concrete.

Renau Boulevard Culvert

Renau Boulevard Culvert

New box culvert construction in Summerville, SC. Work consisted of bypassing freshwater stream, removing existing roadway, pre cast structures, cast in place wing walls, and road construction.

West Ashley Center for Advanced Studies

West Ashley Center for Advanced Studies

Site package for a new education facility located in West Ashley, SC. Work consists of mass grading, parking lot construction, building pad, storm drainage, utilities, and site concrete.

Ladson Elementary Fire Lane

Ladson Elementary Fire Lane

Site improvements project on the campus of Ladson Elementary School. Consisting of demolition, additional sidewalks, storm drainage, and fire access road.

Waterford Townhomes Phase 2B

Waterford Townhomes Phase 2B

SILD was the selected site contractor on this residential development. Worked consisted of clearing, preparing multiple home sites, water services, sewer services, storm drain, asphalt paving, and curb.

Fins Carwash

Fins Carwash

This site was the previous home of a restaurant and laundromat, being converted into a carwash site. After demolition of existing facitilites, SILD installed new storm drainage, sewer service, and water service.

West Ashley Library

West Ashley Library

The site package consists of clearing and grubbing an existing tract. Removing several thousand cubic yards of unsuitable soils, and replacing these soils with structurally sound fill.

Moultrie Middle School Addition

Moultrie Middle School Addition

This is a construction addition of an existing middle school in Mt. Pleasant, South Carolina. The earthwork consisted of prepping building pads for several additions around the campus.

Recent Projects

CSU Science Building

SILD was selected as the site contractor for CSU’s new Science & Engineering Building by Trident Construction.

Crescent Cove Villas

SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.