Storm Drainage

WATER RUNOFF MANAGED

In the Lowcountry, flooding and storm drainage is always a concern on any job. A typical storm drain install includes catch basins, to receive the runoff, and a storm drain pipe is installed to carry the water to a retention pond. We also install non conventional storm water management systems, such as underground retention systems and tidal check valves.
CSU Science Building

CSU Science Building

SILD was selected as the site contractor for CSU’s new Science & Engineering Building by Trident Construction.

Crescent Cove Villas

Crescent Cove Villas

SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.

Grand Bees Amenity Center

Grand Bees Amenity Center

The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.

Beech Hill Middle School

Beech Hill Middle School

SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction.

Crescent Cove

Crescent Cove

This project is a turn key site development located in Summerville, SC. Scope consists of clearing, grading, building pads, roadways, and utilities. 

Benton House Addition

Benton House Addition

Site package for an addition to an existing elderly care facility located in West Ashley, SC. Scope included erosion control, demolition, removing topsoil, and building pad preparation.

Caliber Collision Carolina Park

Caliber Collision Carolina Park

Site package for an automotive faciltiy located in Mt. Pleasant, SC. Scope included erosion control, clearing, underground retention system, storm drainage, asphalt paving, and site concrete.

Renau Boulevard Culvert

Renau Boulevard Culvert

New box culvert construction in Summerville, SC. Work consisted of bypassing freshwater stream, removing existing roadway, pre cast structures, cast in place wing walls, and road construction.

West Ashley Center for Advanced Studies

West Ashley Center for Advanced Studies

Site package for a new education facility located in West Ashley, SC. Work consists of mass grading, parking lot construction, building pad, storm drainage, utilities, and site concrete.

Ladson Elementary Fire Lane

Ladson Elementary Fire Lane

Site improvements project on the campus of Ladson Elementary School. Consisting of demolition, additional sidewalks, storm drainage, and fire access road.

Waterford Townhomes Phase 2B

Waterford Townhomes Phase 2B

SILD was the selected site contractor on this residential development. Worked consisted of clearing, preparing multiple home sites, water services, sewer services, storm drain, asphalt paving, and curb.

North Rhett Storm Drain Improvements

North Rhett Storm Drain Improvements

SILD was the selected General Contractor for the North Rhett Drainage Improvements. The objective of this project was to provide a better drainage system at an active shipping facility.

Dupont Office Shell Building

Dupont Office Shell Building

SILD was the site contractor on this project located in West Ashley, South Carolina. Scope of work included converting and existing storage yard into a fully function office site.

Recent Projects

CSU Science Building

SILD was selected as the site contractor for CSU’s new Science & Engineering Building by Trident Construction.

Crescent Cove Villas

SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.