WATER RUNOFF MANAGED

In the Lowcountry, flooding and storm drainage is always a concern on any job. A typical storm drain install includes catch basins, to receive the runoff, and a storm drain pipe is installed to carry the water to a retention pond. We also install non conventional storm water management systems, such as underground retention systems and tidal check valves.

West Ashley Center for Advanced Studies

Site package for a new education facility located in West Ashley, SC. Work consists of mass grading, parking lot construction, building pad, storm drainage, utilities, and site concrete.

Ladson Elementary Fire Lane

Site improvements project on the campus of Ladson Elementary School. Consisting of demolition, additional sidewalks, storm drainage, and fire access road.

Waterford Townhomes Phase 2B

SILD was the selected site contractor on this residential development. Worked consisted of clearing, preparing multiple home sites, water services, sewer services, storm drain, asphalt paving, and curb.

North Rhett Storm Drain Improvements

SILD was the selected General Contractor for the North Rhett Drainage Improvements. The objective of this project was to provide a better drainage system at an active shipping facility.

Dupont Office Shell Building

SILD was the site contractor on this project located in West Ashley, South Carolina. Scope of work included converting and existing storage yard into a fully function office site.

Fins Carwash

This site was the previous home of a restaurant and laundromat, being converted into a carwash site. After demolition of existing facitilites, SILD installed new storm drainage, sewer service, and water service.

CSU Drainage Improvements

The goal of this project was to increase drainage capacity of existing storm drain, while adding additional drainage to the campus. The existing 3 acre drainage lake, had to be lowered several feet in elevation, to deepen the lake.

Baker Motor Parking Lot

An underground retention system was installed in the parking lot, receiving the drainage from the new storm drain system. Associated work consisted of installing curb inlets, catch basins, and reinforced concrete pipe.

West Ashley Library

The site package consists of clearing and grubbing an existing tract. Removing several thousand cubic yards of unsuitable soils, and replacing these soils with structurally sound fill.

St. Andrews Church Expansion

This project is an expansion of an existing church in Mt. Pleasant, South Carolina. Work consists of removing existing trees, utilizing arborists and large excavators, to safely remove the trees without damaging the surrounding buildings and houses.

Brighton Park Commercial Ponds

SILD was the selected general contractor for this project, located in Nexton, South Carolina. This project was an early site package for a commercial property, where the objective was to provide additional drainage and earthwork for a 9 acre site.

Cane Bay YMCA – Storm Drain

This project consisted of constructing a new recreation facility in the Cane Bay development. This was new drainage install consisting of over a mile of drainage pipe and 65 drainage structures.

Moultrie Middle School Addition

This is a construction addition of an existing middle school in Mt. Pleasant, South Carolina. The earthwork consisted of prepping building pads for several additions around the campus.

Recent Projects

Carnes K8 Campus

The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District.  Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities.  Over 6 acres of...

Carnes Davis Apartments

The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community.  Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...

Sanctuary Cove Phase 6

The Pulte Group selected SILD for the sixth phase of their housing development located within the master planned community of Cane Bay Plantation in Summerville.  The 20 acre project had site work broken into two phases with an early and final site package.  SILD took...