Concrete Work
Road ready
Asphalt paving, concrete paving, and curb and gutter are a crucial task on every project. This is typically the last items installed on a project before landscaping. It is crucial that these items are installed correctly the first time, SILD has the staff and equipment to ensure this happens. Working with geotechnical engineers to guarantee these items are installed per specification.

Claiborne at Brickyard Crossing
SILD imported approximately 15,000 CY of structural fill to complete the 150,000 square foot building pad.

Crescent Cove Villas
SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.

Grand Bees Amenity Center
The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.

Limehouse Village Amenity Center
SILD was selected by Lennar Homes to complete the Limehouse Village Amenity Center site package.

North Charleston Center for Advanced Studies
Highlights from this project include SILD grading crews fine graded and paved 7,000 square yards within a week to meet the owner’s tight deadline.

West Ashley High School Center for Advanced Studies
Working on an active school campus required all land clearing and heavy earth moving work be completed during the summer vacation period.

James Island Charter High School
This site was a challenge in that multiple previous school expansions created many unknown utility conflicts.

St. Andrew’s PSD Maintenance Facility
The St. Andrew’s PSD project was unique in that the site had been previously used as a wastewater treatment facility and a residential landfill.

Beech Hill Middle School
SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction.

Crescent Cove
This project is a turn key site development located in Summerville, SC. Scope consists of clearing, grading, building pads, roadways, and utilities.