Grading Services

On the Level

The grading process starts by utilizing Topcon GPS Equipment to establish lines and grades. With fully integrated GPS equipment, the machines on capable of cutting and filling to grade automatically. Utilizing state of the art equipment and technology, SILD can transform the land from a wooded lot to a landscaped site.

Dorchester District Two Middle School Site

Dorchester District Two Middle School Site

SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction.  The 135,000 square feet building pad required chemical stabilization for on time delivery.  Utility construction included 2,000 linear feet...

Sanctuary Cove Phase 6

Sanctuary Cove Phase 6

The Pulte Group selected SILD for the sixth phase of their housing development located within the master planned community of Cane Bay Plantation in Summerville.  The 20 acre project had site work broken into two phases with an early and final site package.  SILD took...

CSU Science Building

CSU Science Building

SILD was selected as the site contractor for CSU’s new Science & Engineering Building by Trident Construction.

Crescent Cove Villas

Crescent Cove Villas

SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.

Grand Bees Amenity Center

Grand Bees Amenity Center

The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.