SILD was the selected General Contractor for the North Rhett Drainage Improvements. The objective of this project was to provide a better drainage system at an active shipping facility. Some of the existing storm drain pipes and structures were no longer capable of handling the current runoff produced by the facility. SILD removed existing pipes and structures, replaced with larger more capable structures, while maintaining traffic flow of the facility. In addition, SILD added more storm drainage to the facility to increase the overall drainage capacity.
CSU Science Building
SILD was selected as the site contractor for CSU’s new Science & Engineering Building by Trident Construction.