Recent Projects

Dorchester District Two Middle School Site
SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner ...

Carnes K8 Campus
The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District. ...

Carnes Davis Apartments
The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located ...

Sanctuary Cove Phase 6
The Pulte Group selected SILD for the sixth phase of their housing development located within the master planned ...

Central Ave Townhomes
The Lennar Corporation selected SILD to perform the site work package for the 60 unit townhome development in ...

Founders Yard
The Founders Yard project is a 340+ unit multifamily complex on a 14 acre site located in West Ashley. CF Evans ...

CSU Science Building
SILD was selected as the site contractor for CSU’s new Science & Engineering Building by Trident Construction.

Claiborne at Brickyard Crossing
SILD imported approximately 15,000 CY of structural fill to complete the 150,000 square foot building pad.

Crescent Cove Villas
SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to ...

Grand Bees Amenity Center
The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic ...

Limehouse Village Amenity Center
SILD was selected by Lennar Homes to complete the Limehouse Village Amenity Center site package.

North Charleston Center for Advanced Studies
Highlights from this project include SILD grading crews fine graded and paved 7,000 square yards within a week to ...

West Ashley High School Center for Advanced Studies
Working on an active school campus required all land clearing and heavy earth moving work be completed during the ...

James Island Charter High School
This site was a challenge in that multiple previous school expansions created many unknown utility conflicts.

Jacksonboro Sand Mine
Approximately, 30,000 cubic yards of dirt was excavated within the first three months of operation.

St. Andrew’s PSD Maintenance Facility
The St. Andrew’s PSD project was unique in that the site had been previously used as a wastewater treatment ...

Summerville Stormwater Retention Pond
The Town of Summerville contracted SILD to create a new 2.6 acre stormwater pond.

Beech Hill Middle School
SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner ...

Crescent Cove
This project is a turn key site development located in Summerville, SC. Scope consists of clearing, grading, ...

Benton House Addition
Site package for an addition to an existing elderly care facility located in West Ashley, SC. Scope ...

Caliber Collision Carolina Park
Site package for an automotive faciltiy located in Mt. Pleasant, SC. Scope included erosion control, clearing, ...

Renau Boulevard Culvert
New box culvert construction in Summerville, SC. Work consisted of bypassing freshwater stream, removing existing ...

West Ashley Center for Advanced Studies
Site package for a new education facility located in West Ashley, SC. Work consists of mass grading, parking lot ...

Ladson Elementary Fire Lane
Site improvements project on the campus of Ladson Elementary School. Consisting of demolition, additional ...

Waterford Townhomes Phase 2B
SILD was the selected site contractor on this residential development. Worked consisted of clearing, preparing ...

North Rhett Storm Drain Improvements
SILD was the selected General Contractor for the North Rhett Drainage Improvements. The objective of this project ...

Dupont Office Shell Building
SILD was the site contractor on this project located in West Ashley, South Carolina. Scope of work included ...

Fins Carwash
This site was the previous home of a restaurant and laundromat, being converted into a carwash site. After ...

CSU Drainage Improvements
The goal of this project was to increase drainage capacity of existing storm drain, while adding additional ...

Baker Motor Parking Lot
An underground retention system was installed in the parking lot, receiving the drainage from the new storm drain ...

Camp Road Middle School – Early Site Package
This project consisted of demolition of an existing campus, to construct the new Camp Road Middle School. Work ...

West Ashley Library
The site package consists of clearing and grubbing an existing tract. Removing several thousand cubic yards of ...

Mercedes Benz Marshalling Yard – Storm Drain
Scope of work included installing large diameter reinforced concrete pipe, inside existing outfall ditches. ...

St. Andrews Church Expansion
This project is an expansion of an existing church in Mt. Pleasant, South Carolina. Work consists of removing ...

Brighton Park Commercial Ponds
SILD was the selected general contractor for this project, located in Nexton, South Carolina. This project was an ...

Cane Bay YMCA – Storm Drain
This project consisted of constructing a new recreation facility in the Cane Bay development. This was new ...

Moultrie Middle School Addition
This is a construction addition of an existing middle school in Mt. Pleasant, South Carolina. The earthwork ...