Storm Drainage
WATER RUNOFF MANAGED
In the Lowcountry, flooding and storm drainage is always a concern on any job. A typical storm drain install includes catch basins, to receive the runoff, and a storm drain pipe is installed to carry the water to a retention pond. We also install non conventional storm water management systems, such as underground retention systems and tidal check valves.

CSU Science Building
SILD was selected as the site contractor for CSU’s new Science & Engineering Building by Trident Construction.

Claiborne at Brickyard Crossing
SILD imported approximately 15,000 CY of structural fill to complete the 150,000 square foot building pad.

Crescent Cove Villas
SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.

Grand Bees Amenity Center
The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.

Limehouse Village Amenity Center
SILD was selected by Lennar Homes to complete the Limehouse Village Amenity Center site package.

North Charleston Center for Advanced Studies
Highlights from this project include SILD grading crews fine graded and paved 7,000 square yards within a week to meet the owner’s tight deadline.

West Ashley High School Center for Advanced Studies
Working on an active school campus required all land clearing and heavy earth moving work be completed during the summer vacation period.

James Island Charter High School
This site was a challenge in that multiple previous school expansions created many unknown utility conflicts.

St. Andrew’s PSD Maintenance Facility
The St. Andrew’s PSD project was unique in that the site had been previously used as a wastewater treatment facility and a residential landfill.

Summerville Stormwater Retention Pond
The Town of Summerville contracted SILD to create a new 2.6 acre stormwater pond.